/    /  Installation

Installation

INSTALLING SOLID WOOD FLOORING

INSTALLING SINGLE STRIP FLOORING COSLOC 5G

INSTALLATION OF 3-LAYER HARDWOOD FLOORING “HERRINGBONE T&G”

INSTALLATION OF 3-LAYER HARDWOOD FLOORING “CHEVRON T&G”

INSTALLATION VIDEO

Prior to installation, Coswick hardwood flooring must comply with the storage and transportation requirements.

Relative air humidity: 40–65%
Air temperature: not below +18 °C

Hardwood flooring should be stored in heated indoor premises while maintaining the above parameters.

Hardwood products may be transported by all modes of transport in covered vehicles in accordance with the applicable cargo transportation regulations.

During transportation and storage, the integrity of the packaging must be ensured, and the following must be prevented:

  • mechanical damage;
  • moisture exposure;
  • exposure to direct sunlight;
  • contamination;
  • damage caused by fungi or insects.

Bulk loading of hardwood flooring and unloading by dropping are not permitted.

Failure to comply with storage and transportation conditions may result in changes to the geometry of the hardwood flooring, making proper installation and subsequent use impossible.

Non-compliance with these requirements voids the manufacturer’s warranty.